• EL Qasr compression station at KPC to maintain the DCQ of NG due to the decline of reservoir pressure, and continuity of NG delivery to Obayed. The total cost reached $310 MM.
• Rehabilitation of facilities at GUPCO (Ph. III) including Ramadan-6, Morgan-36 and October platforms. The total cost reached 274 MM.
• Helal Offshore field redevelopment at GUPCO to produce 3 - 5 Mbbl/d of crude oil. The total cost reached $234 MM.
• North Shedwan development at GUPCO for production increase with about 2-3 M bbl/d and the replacement of the rental facilities with permanent ones. The total cost reached $32.5 MM .
• NNW development (Phase I) at Petrobel and the required facilities to accommodate Gas production with an amount of 175 MMscfd, in addition to the construction of 24"/10 km pipeline for gas transportation from NNW to N/D-11 area with total cost reached $11MM (does not include the drilling of 2 wells).
• East Abu Sannan permanent facilities completion at Borapetco to accommodate the NG production of about 5 MMscfd with expected increase to reach 25 MMscfd. The total cost reached $9.5 MM.
• Establishment of crude oil gathering and processing plant at Hana & West Hana at Petrodara to accommodate the existing production of oil of about 15M bbl/d and transportation to GPC facilities. The total cost reached $2.7 MM.